Located in District 10, Ho Chi Minh City, the 3C Đường 3/2 Building is a mid-sized commercial property designed to meet the needs of office and business operations.
Automatic Fire Alarm System
Heat and smoke detectors have been installed on all floors of the building and are connected to a modern control center, ensuring rapid detection and notification of any fire incidents.
Sprinkler Fire Suppression System
An automatic water-based sprinkler system has been deployed in office areas and corridors to suppress fires effectively and promptly.
Wall-Mounted Fire Hose System
Strategically positioned wall-mounted fire hose cabinets include high-standard fire hoses and connection valves to support manual firefighting efforts.
Ventilation and Smoke Extraction System
VNPD designed and installed an efficient ventilation and smoke extraction system across the building’s floors. The equipment is arranged scientifically to minimize the risk of toxic smoke spreading during a fire.
Exit Lights and Directional Signage
Exit lights and emergency directional signs have been installed on every floor, providing continuous illumination and clear guidance, even during power outages.
The fire protection project at the 3C Đường 3/2 Building was completed on schedule and passed rigorous inspection and acceptance testing.