MECHANICAL AND ELECTRICAL CONSTRUCTION PROJECT AT BAU NON RUBBER FACTORY

Construction - Execution

In order to ensure a modern, safe and energy-saving operating system, MEP construction is one of the important items deployed at Bau Non rubber factory. This system includes mechanical and electrical items (MEP), helping to optimize the production process and ensure a standard working environment.

1. HVAC ventilation and air conditioning system

The HVAC system helps control the temperature, humidity and air quality in the factory, ensuring a cool working environment, reducing the impact of high temperatures during the production process. This system includes:

+ Heating, ventilation and air conditioning system.

+ Exhaust system.

+ Hot and cold water system.

2. Water supply and drainage system (P&S)

The water supply and drainage system plays an important role in supplying water for production and treating wastewater, ensuring no environmental pollution. Items include:

+ Clean water and wastewater systems.

+ Rainwater pipe system.

+ Automatic sprinkler system.

3. Fire alarm and fire fighting system

To ensure safety for the entire factory, the fire prevention and fighting system is fully installed with the following items:

+ Automatic fire alarm system.

+ Toxic gas warning system.

+ Water and foam fire fighting system.

+ Fire extinguisher and sprinkler system.

Address

Ba Ria - Vung Tau

Scale

4.303 m2

Category

Electromechanical Construction

YOU MAY BE INTERESTED

MEP CONSTRUCTION PROJECT AT LONG BINH WAREHOUSE CLUSTER

Construction - Execution

MAINTENANCE – OPERATION PROJECT OF BUILDING 49 CMT8 CAN THO

Building maintenance and operation

MAINTENANCE – OPERATION PROJECT OF BUILDING 126 CAN THO

Building maintenance and operation

MAINTENANCE – OPERATION PROJECT OF JOLIPOLI BUILDING VO VAN KIET

Building maintenance and operation