The MEP construction project for Bau Non rubber factory was carried out by Delta Industries at 17 Phu Chau, An Binh, Binh Duong, with a total scale of 5,992 m². This is one of the important projects, aiming to ensure the stable operation of the mechanical and electrical system (MEP), helping to optimize the production and operation efficiency of the factory.
1. HVAC ventilation and air conditioning system
The HVAC system helps control temperature, humidity and air quality, ensuring an ideal working environment. In particular, this system also helps save energy and reduce operating costs.
+ Heating, ventilation and air conditioning system.
+ Hot and cold water system.
2. Water supply and drainage system (P&S)
The P&S system ensures water supply for production and daily life, while safely treating wastewater, limiting environmental impacts.
This system includes:
+ Water system in the building.
+ Automatic sprinkler system.
+ Water conservation system.
3. Electrical system
The electrical system plays an important role in factory operation, including heavy electricity and light electricity.
+ Heavy electricity: Transformer station system, distribution cabinet, socket, grounding system, lightning protection, etc.
+ Light electricity: LAN system, Internet, surveillance camera, PA system, etc.
4. Fire alarm and fire fighting system
To ensure safety, the fire alarm and fire fighting system is designed to high standards, including:
+ Fire alarm system.
+ Toxic gas warning system.
+ Automatic door system.
+ Fire extinguisher system, fire hose, fire fighting foam system, etc.