MEP CONSTRUCTION PROJECT AT LONG BINH WAREHOUSE CLUSTER

Construction - Execution

Long Binh warehouse cluster is located in Quarter 8, Long Binh Ward, Bien Hoa City, Dong Nai, with a scale of 55,379 m². This is one of the modern warehouse complexes, meeting the production and storage needs of businesses.

The project focuses on Electromechanical construction, including mechanical and electrical systems, water supply and drainage, air conditioning and fire protection, to ensure efficient, safe and energy-saving warehouse operations.

1. HVAC ventilation and air conditioning system

The HVAC system helps control temperature and humidity, ensuring air quality in the warehouse. At the same time, it also helps optimize operating costs thanks to its energy-saving ability.

The system includes:

+ Heating, ventilation and air conditioning systems.

+ Exhaust systems.

+ Hot and cold water systems.

2. Electrical systems

The electrical system plays an important role, ensuring a stable and safe power supply.

+ Heavy electricity: Transformer stations, distribution cabinets, lightning protection systems.

+ Light electricity: LAN systems, surveillance cameras, PA systems.

3. Fire alarm and fire fighting systems

To ensure the safety of the warehouse, the fire prevention and fighting system is installed according to high standards, including:

+ Automatic fire alarm system.

+ Fire sprinkler system.

+ Toxic gas warning system.

Address

Bien Hoa, Dong Nai

Scale

55.379 m2

Category

Electromechanical Construction

YOU MAY BE INTERESTED

MAINTENANCE – OPERATION PROJECT OF BUILDING 49 CMT8 CAN THO

Building maintenance and operation

MAINTENANCE – OPERATION PROJECT OF BUILDING 126 CAN THO

Building maintenance and operation

MAINTENANCE – OPERATION PROJECT OF JOLIPOLI BUILDING VO VAN KIET

Building maintenance and operation

SUSHI TEI BUILDING MAINTENANCE, UPKEEP & OPERATION PROJECT 

Building maintenance and operation