Cuu Long warehouse cluster is located at 736 National Highway 91, Thoi Thuan Ward, Thot Not District, Can Tho City, with a scale of 55,379 m². This is one of the large-scale projects, providing optimal production and storage space for businesses.
The MEP construction project at Cuu Long warehouse cluster includes many important items such as ventilation, water supply and drainage, electricity and fire protection systems. This system not only helps optimize warehouse operations but also ensures safety and energy savings.
Ventilation and air conditioning system
The HVAC system plays a role in controlling the temperature, humidity and air quality in the warehouse. This helps improve the working environment and optimize operating costs thanks to the ability to save energy.
Main components:
– Heating, ventilation and air conditioning system.
– Exhaust system.
– Digital control system.
– Hot and cold water system.
Water supply and drainage system
The water supply and drainage system (P&S) at Cuu Long warehouse cluster ensures sufficient water supply for production and safe wastewater treatment.
Main items:
– Domestic and production water system.
– Rainwater drainage system.
– Automatic sprinkler system.
– Water conservation system.
Electrical system
The electrical system in MEP construction includes heavy electricity and light electricity, ensuring a stable and safe power supply.
– Heavy electricity: Transformer station, distribution cabinet, lightning protection system, grounding system.
– Low electricity: LAN, surveillance camera, PA system.
Fire alarm and fire fighting system
This is an important item to protect the warehouse from the risk of fire and explosion, including:
– Fire alarm system, toxic gas warning system.
– Automatic fire fighting system, fire extinguisher.
– Automatic door system.