REFRIGERATION CONSTRUCTION PROJECT AT MELINH POINT BUILDING

Construction - Execution

MeLinh Point Building is one of the prominent Grade A office buildings in the center of District 1, Ho Chi Minh City. With modern design, high-class amenities and strategic location, this is an ideal place for domestic and foreign enterprises to set up their headquarters.

1. Installing air conditioning system for server room (Data Center)

+ Using high-capacity precision air conditioning system, ensuring stable temperature for the data center.

+ Air ducts and air filtration system are optimally designed to minimize dust, ensuring the performance of server equipment.

+ Check and calibrate humidity and temperature according to international standards to avoid overheating that affects IT equipment.

2. Install cooling and cooling systems for production lines at factories

+ Supply and install water cooling systems with large capacity cooling towers, meeting the cooling needs of production lines.

+ The cooling water pipeline system is designed according to anti-corrosion standards, ensuring stable and long-term operation.

+ Deploy a high-efficiency circulating pump system, minimizing energy consumption during operation.

With a team of experienced technicians, the project was completed on schedule and met strict technical requirements, contributing to improving the operational efficiency of the MeLinh Point building as well as factories in the system.

Location

District 1, Ho Chi Minh City

Scale

20.000m²

Category

Refrigeration construction

YOU MAY BE INTERESTED

MEP CONSTRUCTION PROJECT AT LONG BINH WAREHOUSE CLUSTER

Construction - Execution

MAINTENANCE – OPERATION PROJECT OF BUILDING 49 CMT8 CAN THO

Building maintenance and operation

MAINTENANCE – OPERATION PROJECT OF BUILDING 126 CAN THO

Building maintenance and operation

MAINTENANCE – OPERATION PROJECT OF JOLIPOLI BUILDING VO VAN KIET

Building maintenance and operation