FRESH CONCRETE PARK PROJECT AT TAM BINH WAREHOUSE CLUSTER

Warehouse - Industrial park

Tam Binh Warehouse is one of the large-scale warehouse clusters in Quarter 8, Long Binh Ward, Bien Hoa City, Dong Nai. With a total area of ​​up to 55,379 m², this project provides standard warehouse space, suitable for the storage and production needs of many businesses.

To ensure a solid foundation and optimize usage, Tam Binh warehouse project has deployed the project of pouring fresh concrete floors – a solution that brings high durability and good load-bearing capacity.

Technical standards

– Using high-quality ready-mixed concrete to ensure durability over time.

– The floor thickness is calculated to suit the needs of storing goods and moving heavy trucks.

– The floor surface is smooth, limiting cracks and good load-bearing capacity.

Construction process

The project of pouring ready-mixed concrete floors for Tam Binh warehouse is carried out according to a professional process, ensuring the quality and progress of the project:

– Site preparation: Cleaning, leveling and creating flatness for the floor.

– Steel construction: Shaping the structure to increase load-bearing capacity.

– Pour ready concrete: Using high-quality concrete, suitable for the needs of using the warehouse.

– Flooring, surface finishing: Ensuring a flat, smooth floor, increasing durability and abrasion resistance.

– Concrete maintenance: Checking and maintaining to achieve optimal quality.

Location

Binh Duong Province

Location

27857.1 m2

Category

Pouring fresh concrete floor

YOU MAY BE INTERESTED

A-connection KCN Hàm Kiệm II

Ham Kiem II Industrial Park – Binh Thuan

Warehouse - Industrial park

MEP CONSTRUCTION PROJECT AT LONG BINH WAREHOUSE CLUSTER

Construction - Execution

A-connection cho thuê tòa nhà Bình Thủy Cần Thơ

MAINTENANCE – OPERATION PROJECT OF BUILDING 49 CMT8 CAN THO

Building maintenance and operation

MAINTENANCE – OPERATION PROJECT OF BUILDING 126 CAN THO

Building maintenance and operation