Cuu Long warehouse cluster is located at 736 National Highway 91, Thoi Thuan Ward, Thot Not District, Can Tho City, with a scale of 55,379 m². This is one of the large-scale projects, providing optimal production and storage space for businesses.
The MEP construction project at Cuu Long warehouse cluster includes many important items such as ventilation, water supply and drainage, electricity and fire protection systems. This system not only helps optimize warehouse operations but also ensures safety and energy savings.
1. Ventilation and air conditioning system
The HVAC system plays a role in controlling temperature, humidity and air quality in the warehouse. This helps improve the working environment and optimize operating costs thanks to the ability to save energy.
Main components:
+ Heating, ventilation and air conditioning systems.
+ Exhaust systems.
+ Digital control systems.
+ Hot and cold water systems.
2. Electrical systems
The electrical system in MEP construction includes heavy electricity and light electricity, ensuring a stable and safe power supply.
+ Heavy electricity: Transformer stations, distribution cabinets, lightning protection systems, grounding systems.
+ Light electricity: LAN, surveillance cameras, PA systems.
3. Fire alarm and fire fighting systems
This is an important item to protect warehouses from the risk of fire and explosion, including:
+ Fire alarm system, toxic gas warning system.
+ Automatic fire fighting system, fire extinguisher.
+ Automatic door system.