A-Connection installed the refrigeration system with high technical standards, ensuring stable operation, energy saving and meeting the needs of the building.
1. VRV/VRF central air conditioning system
+ Installing a large capacity air conditioning system, ensuring effective cooling for the entire office and common areas.
+ The system is optimally designed, helping to reduce energy consumption and ensure a comfortable working environment.
+ Using advanced technology, smart control helps to flexibly adjust the temperature for each area.
2. Air ventilation and cooling system
+ Construction of the ventilation system ensures air circulation in the building, helping to limit humidity and improve air quality.
+ The fan and air duct system is designed and installed according to standards, helping to maintain appropriate pressure and ventilation.
3. Installation of cold storage and cooling system for server room
+ Construction of cold storage to preserve equipment and technical materials, ensuring stable temperature, limiting damage due to high temperature.
+ Construction of specialized cooling system for server room, ensuring continuous operation and avoiding overheating.
+ Using specialized air conditioners, capable of adjusting temperature accurately and operating stably for a long time.
The project is implemented with high quality standards, ensuring the refrigeration system operates effectively, contributing to creating a comfortable working environment at Petro Vietnam building.