FIRE PROTECTION CONSTRUCTION PROJECT AT 3C STREET 3/2 BUILDING – HO CHI MINH CITY

Fire protection and prevention

Located in District 10, Ho Chi Minh City, the 3C Street 3/2 Building is a mid-sized commercial property designed to meet the needs of office and business operations.

Automatic Fire Alarm System 

Heat and smoke detectors have been installed on all floors of the building and are connected to a modern control center, ensuring rapid detection and notification of any fire incidents.

Sprinkler Fire Suppression System 

An automatic water-based sprinkler system has been deployed in office areas and corridors to suppress fires effectively and promptly.

Wall-Mounted Fire Hose System 

Strategically positioned wall-mounted fire hose cabinets include high-standard fire hoses and connection valves to support manual firefighting efforts.

Ventilation and Smoke Extraction System 

A-connection designed and installed an efficient ventilation and smoke extraction system across the building’s floors. The equipment is arranged scientifically to minimize the risk of toxic smoke spreading during a fire.

Exit Lights and Directional Signage 

Exit lights and emergency directional signs have been installed on every floor, providing continuous illumination and clear guidance, even during power outages.

The fire protection project at the 3C Street 3/2 Building was completed on schedule and passed rigorous inspection and acceptance testing.

Location

District 10, Ho Chi Minh City

Scale

500m²

Category

Fire Fighting and Prevention

YOU MAY BE INTERESTED

MEP CONSTRUCTION PROJECT AT LONG BINH WAREHOUSE CLUSTER

Construction - Execution

MAINTENANCE – OPERATION PROJECT OF BUILDING 49 CMT8 CAN THO

Building maintenance and operation

MAINTENANCE – OPERATION PROJECT OF BUILDING 126 CAN THO

Building maintenance and operation

MAINTENANCE – OPERATION PROJECT OF JOLIPOLI BUILDING VO VAN KIET

Building maintenance and operation