STRUCTURAL FRAME INSTALLATION PROJECT AT TAM BINH WAREHOUSE CLUSTER

Warehouse - Industrial park

Tam Binh Warehouse is a large-scale warehouse and factory project, located at 17 Phu Chau, An Binh, Di An, Binh Duong, with a total area of ​​27,857.1 m2. This is a standard factory area, suitable for many manufacturing and warehousing enterprises, providing spacious space and modern infrastructure.

One of the important items at Tam Binh warehouse is the installation of the factory’s structural frame. The solid structural system helps optimize the usable space, ensures durability and safety, and creates favorable conditions for businesses to expand their production scale.

Workshop structural frame installation process

The workshop structural frame installation process at Tam Binh warehouse is carried out professionally in each stage, ensuring safety and optimal quality.

– Step 1: Plan and preparation at the construction site

Survey the overall site and make a detailed implementation plan. Prepare human resources, machinery, materials and appropriate construction methods.

– Step 2: Check and survey the anchor bolt location

Evaluate the location, accuracy and durability of the anchor bolt system before installation. Ensure that the technical parameters meet safety and load-bearing requirements.

– Step 3: Receive and deliver materials at the construction site

Transport materials to the construction site, check the quantity and quality. Ensure that the materials meet technical standards, are not damaged or have incorrect dimensions.

– Step 4: Store materials on site

Arrange a reasonable storage area for materials, avoiding the effects of weather and environment. Check periodically to ensure that materials are not oxidized or damaged.

– Step 5: Erection at site

Conduct the installation of each structural frame part of the factory according to the design. Always ensure proper techniques, labor safety and construction progress.

– Step 6: Supervision and acceptance inspection plan

Closely monitor the construction process, check the quality after each stage. Conduct acceptance, check the solidity and hand over the project to meet the standards.

The role of the factory’s structural frame

The installation of the factory’s structural frame plays an important role in the sustainability of the project, bringing many benefits to the business:

– Increase sustainability: Steel or concrete structural frames help the factory withstand force well, resist vibration, and ensure safety during operation.

– Save costs: Construction is quick and less expensive than traditional construction methods.

– Flexible expansion: Easy to adjust and expand the scale of the factory according to usage needs.

– Optimize space: The structural frame helps create a spacious space, suitable for many manufacturing and warehousing industries.

Meet technical standards: Designed according to safety standards, high load-bearing capacity, suitable for many different types of factories.

Location

Binh Duong Province

Scale

27857.1 m2

Category

Installation of factory structural frame

YOU MAY BE INTERESTED

MEP CONSTRUCTION PROJECT AT LONG BINH WAREHOUSE CLUSTER

Construction - Execution

MAINTENANCE – OPERATION PROJECT OF BUILDING 49 CMT8 CAN THO

Building maintenance and operation

MAINTENANCE – OPERATION PROJECT OF BUILDING 126 CAN THO

Building maintenance and operation

MAINTENANCE – OPERATION PROJECT OF JOLIPOLI BUILDING VO VAN KIET

Building maintenance and operation